Modernising Critical Backup Power Infrastructure at a Luxury Southbank Hotel
At ARA Electrical Services, we understand that in mission-critical environments, reliability is everything. Recently, our team successfully completed a full PLC upgrade for the generator backup power system at a luxury hotel in Southbank, delivering a seamless transition with zero disruption to facility operations.
The project involved migrating a legacy Rockwell SLC control platform to the latest Rockwell 5069 CompactLogix PLC series, significantly improving system reliability, performance, diagnostics, and long-term supportability.
Project Scope
The upgrade included:
- Full PLC hardware replacement and software conversion
- Integration of a Rockwell Optix HMI platform
- Enhanced system trending, alarming, and advanced diagnostics
- Electrical installation and commissioning
- Same-day Site Acceptance Testing (SAT)
The introduction of the Rockwell Optix HMI provides operators with far greater visibility into system performance, enabling improved fault diagnostics, faster response times, and better overall operational awareness.
Zero Downtime in a Live Hospitality Environment
The most critical requirement of the project was maintaining uninterrupted power supply to the facility throughout the changeover and live testing process.
Operating within a live luxury hospitality environment meant there was absolutely no room for disruption. Through detailed planning, risk mitigation strategies, and precise execution, our team successfully completed the upgrade with zero loss of power to the hotel.
This outcome reflects the experience and capability of the ARA Electrical Services team in delivering complex automation and critical infrastructure projects where reliability cannot be compromised.
Delivering Future-Ready Infrastructure
Upgrading legacy control systems is essential for maintaining operational reliability, reducing downtime risk, and ensuring ongoing supportability of critical infrastructure assets.
The new CompactLogix platform positions the facility with:
- Improved long-term maintainability
- Increased system reliability
- Enhanced diagnostics and monitoring
- Greater scalability for future upgrades
At ARA Electrical Services, we specialise in industrial automation, PLC upgrades, critical power systems, and mission-critical infrastructure projects across Melbourne and beyond.
If your facility is operating on ageing control systems, our team can help develop a modernisation strategy that minimises risk while maximising operational continuity.


