Request a Quote

ARA Electrical Services were awarded the design and construction of a purified water system. The project required our ARA engineering team and installation team to work seamlessly to provide a successful outcome for the client.

Jurlique

Purified water system (HA)

Engineered design, including, HMI, PLC, programming.

MCC, HMI, panel fabrication

Site installation including equipment in hazardous areas

Hazardous area certification and documentation

Raw materials dosing (HA)

Installation of MCC, and associated field cables.

Installation and wiring of motors and instrumentation in Dangerous goods store (HA) & Pharmaceutical manufacturing areas (HA & non-HA)

Installation of HMI’s in bespoke enclosure in hazardous area location

Commissioning  with suppliers engineers (German)

Hazardous area certification and documentation

Gas detection system

Engineered design, including, HMI, PLC, programming.

PCC, HMI, panel fabrication

Site installation including equipment in hazardous areas

Hazardous area certification and documentation

Interlocking of gas detection with Raw Materials Dosing System, site HVAC and fire detection system.