Contact Us03 9431 3229
ARA Electrical Services
  • Contracting
    • Cable Haulage
    • Commercial Installations
    • Control Panel Manufacturing
    • Service and Maintenance
    • Hazardous Area
    • High Voltage
    • Industrial Automation
    • Industrial Installations
    • Machine Automation
    • Machine Safety
    • Manufacturing
    • Renewable Energy
    • Switchboard Manufacturing
    • Underground Earthing Systems
    • Variable Speed Drives
    • Vision Systems
  • Engineering
    • Compliance Audits
    • Commercial Installations
    • Control Panel Manufacturing
    • Electrical Drafting
    • Hazardous Area
    • High Voltage
    • Industrial Automation
    • PLC Programming and Commissioning
    • Power Analysis
    • Process Automation
    • Project Management
    • Protection Study
    • Machine Automation
    • Machine Safety
    • Rapid Earth Fault Current Limiter
    • Renewable Energy
    • Switchboard Manufacturing
    • Underground Earthing Systems
    • Variable Speed Drives
    • Vision Systems
  • Industries
    • Chemical
    • Dairy
    • Food & Beverage
    • Hazardous Area
    • Heavy Clay
    • High Voltage
    • Manufacturing
    • Mining
    • Oil & Gas
    • Petrochemical
    • Pharmaceutical
    • Water
  • Projects
  • Company
    • OHS
    • Team
    • Employment
    • Capability Statement
    • Blog
    • Contact
  • Menu Menu
You are here: Home1 / Projects2 / All Projects3 / Major LV mains upgrade

Major LV mains upgrade

ARA has recently completed a significant LV mains upgrade for a major processing facility located in Melbourne.

The project involved engineering the cable ladder and supporting structures to ensure they could adequately support the substantial weight of the large copper cables required to power the plant’s extensive MCC (Motor Control Center).

Once the cable ladder and supporting structures were designed and installed, ARA proceeded to carefully and safely install the six sets of cables, one by one, using a heavy cable winch.

Following the cable installation, our team meticulously dressed and terminated each cable to the highest standards of quality. Rigorous testing was conducted to ensure compliance with AS3000 regulations and the completion of five mandatory tests.

With the installation meeting all necessary standards, power was applied, enabling commissioning activities to commence at the major industrial processing plant in Victoria.

REQUEST A QUOTE

GET IN TOUCH WITH US

GET IN TOUCH

FOLLOW US ON SOCIALS

FOLLOW US

ARA Electrical Services

REC 8473

Factory 10, 23 Susan Street
Eltham, VIC 3095

65 Indian Dr
Keysborough, VIC 3173

Phone: 03 9431 3229
Email: enquiries@araelec.com.au

OHS
Team
Projects
Employment
Blog
Capability Statement
Privacy Policy

Industries

Chemical
Dairy
Food & Beverage
Hazardous Area
Heavy Clay
High Voltage
Manufacturing
Mining
Oil & Gas
Petrochemical
Pharmaceutical
Water

Contracting

Cable Haulage
Commercial Installations
Control Panel Manufacturing
Service and Maintenance
Hazardous Area
High Voltage
Industrial Automation
Industrial Installations
Machine Automation
Machine Safety
Manufacturing
Switchboard Manufacturing
Underground Earthing Systems
Variable Speed Drives
Vision Systems

Engineering

Commercial Installations
Control Panel Manufacturing
High Voltage
Industrial Automation
Compliance Audits
Electrical Drafting
Hazardous Area Classification & Design
PLC Programming &Commissioning
Power Analysis
Process Automation
Project Management
Protection Study
Rapid Earth Fault Current Limiter (REFCL)
Machine Automation
Machine Safety
Switchboard Manufacturing
Underground Earthing Systems
Variable Speed Drives
Vision Systems

Copyright © 2024 ARA Electrical Services. All Rights Reserved
Hazardous Area – bulk fuel storage upgradeSugar Dust HA Upgrade
Scroll to top