Department of Defence Network – Kapooka Army Barracks
HV Design HV & ARC flash study- Department of Defence Network – Kapooka Army Barracks – ARA was awarded a contract to undertake the following studies of the Kapooka Army Barracks 22kV Network:
- Site Wide Protection Study
- Earthing Study for all HV assets
HV Arc Flash Study for all ground mount assets - The Site consisted of approximately 5kms of overhead line / Underground and 38 substations being either ground mount or pole mount.
- Numerous switching arrangements were reviewed and the site had two 22kV supply options from the distributor to consider.