Major Bottling Plant HV and LV upgrade
ARA were awarded the design for the HV and LV supply upgrade which continued through to a complete implementation. A separate contract was awarded for the building light and power electrical installation.
The key elements of the project were:
- HV modifications to the existing HV switchboard
- Specifying and installing a new RMU with protection
- Relocating, refurbishing and testing two of 2MVA transformers
- LV modelling of supply requirements
- Detailed Earthing design with a step and touch potential analysis
- Detailed protection report with appropriate setting requirements
- Specifying a new main switchboard after all alternative options were exhausted
- Procurement, factory acceptance test, installation, test and commissioning of a new main switchboard
- Installation of replacement HV mains
- Installation of LV mains and submains to all supply points including necessary cable support and mechanical protection
- As built documentation