ARA Electrical Services were awarded the design and construction of a chemical atmospheric mixing plant. The project required our ARA engineering team and installation team to work seamlessly to prove a successful outcome for the client.

The project included:

Atmospheric mixing plant

Full engineered design, including SCADA, HMI, PLC, programming, instrument selection

MCC, HMI, RIO panel fabrication

Site installation, fully documented testing and commissioning

Engineering design, installation, programming and commissioning of 15 HMI screens located in chemical wet areas.

Automated bulk filling camera system

Full engineered design, including SCADA, HMI, PLC, programming, instrument selection

MCC, HMI, RIO panel fabrication

Site installation, fully documented testing and commissioning

Engineering design, installation, programming and commissioning of 15 HMI screens located in chemical wet areas.

Class 5 mixing plant

Full engineered design, including SCADA, HMI, PLC, programming, instrument selection

Site installation of semi-automated bulk filling system with ARA designed cable tracking system.

Site installation., fully documented testing and commissioning

Manufacturing